Valmet delivers a new recovery boiler to ITC in India

Valmet will deliver a new recovery boiler and ash leaching plant to ITC’s Bhadrachalam pulp mill in India. The new boiler will replace three existing boilers. The start-up of the new recovery boiler is scheduled for late 2021.

The order was included in Valmet’s orders received of the Q1 2019. The value of the order of this scope is typically around EUR 50 60 M.

The Valmet RECOX+ recovery boiler will have a capacity of 2,700 tDS/day. The boiler includes several high-power features, for example, high steam parameters, flue gas heat recovery, combustion air preheating, feed water preheating and vent gas heat recovery. This enables 20% higher steam production compared to conventional recovery boilers. The medium size and high steam parameters set specific requirements for material design.

The delivery also includes electrostatic precipitators (ESPs) which remove dust particles from recovery boiler flue gases.

Potassium and chloride levels in the ESP ash are controlled with two-stage ash leaching system. Valmet AshLeach Duo is a well-proven, uniquely simple and effective system.

Previous articleA new company form a part of Heat Exchange Group
Next articleMarley® Tower named 2019 Environmental Leader Product
Heat Exchanger World Publisher
Heat Exchanger World is a leading international magazine covering all aspects of the product supply chain of heat exchangers. Heat Exchanger World is part of the KCI Group of Companies. We are a leading knowledge, communication and information company connecting business-to-business professionals by building and sustaining global communities, solving their information needs and helping them to develop their professional life and friendships.