Fervo completes a 30-day well test at “Project Red”

Fervo Energy (Fervo) has successfully completed the well test at its full-scale commercial pilot, Project Red, in northern Nevada.

The successful well test confirms the commercial viability of Fervo’s drilling technology and establishes Project Red as the most productive enhanced geothermal system in history. The 30-day well test, a standard for geothermal, achieved a flowrate of 63 liters per second at high temperature that enables 3.5 MW of electric production, setting new records for both flow and power output from an enhanced geothermal system.

Fervo’s results from Project Red support the findings of the DOE Enhanced Geothermal Earthshot and show that geothermal energy could supply over 20% of U.S. power needs and complement wind and solar to reach a fully decarbonized grid. Fervo’s drilling and well test results pave the way for the U.S. to meet this goal ahead of schedule.

Previous articleCheniere to build a gas pipeline to feed LNG expansion
Next articleUSA Industries expands its location in Louisiana
Heat Exchanger World Publisher
Heat Exchanger World is a leading international magazine covering all aspects of the product supply chain of heat exchangers. Heat Exchanger World is part of the KCI Group of Companies. We are a leading knowledge, communication and information company connecting business-to-business professionals by building and sustaining global communities, solving their information needs and helping them to develop their professional life and friendships.