Valmet will deliver a comprehensive Valmet DNA Automation System to Lostock Sustainable Energy Plant (LSEP) currently under construction in Northwich, Cheshire, the United Kingdom.
The plant will be operational in 2025.
The LSEP facility will export 60.3 megawatt of electricity to the grid using residual waste as a fuel. The residual waste is a waste material remaining once materials that can be recycled have been removed.