Koenig & Bauer makes itself independent of pipeline gas

Koenig & Bauer has been working intensively on becoming independent of pipeline gas. As a result, the process gas previously required for production will be fully substituted by the end of July 2022. In addition, the fuel supply for heating energy will be modified at the major production sites by September 1st, 2022. By adapting the infrastructure, pipeline gas will thus be replaced by an energy mix consisting of LPG, heating oil, and district heating, among others, before the start of the heating season. As a consequence of a restricted gas supply, unforeseen fluctuations in the power grid cannot be ruled out. Koenig & Bauer has therefore procured high-capacity mobile emergency power units (NEA) which can be deployed as required. This means that Koenig & Bauer’s own production is largely secured at all European plants, even in the event of a Russian gas supply stoppage.

Koenig & Bauer also continues to work on sustainable energy concepts. The overriding goal is long-term independence from fossil fuels and maximum self-sufficiency, particularly with regard to achieving the sustainability targets set by Koenig & Bauer itself and for maximum resilience to future fluctuations on the energy markets.

Previous articleTranter installs NovusBloc® in a refinery in Israel
Next articleEUROAPI invests to build a biomass boiler in France
Heat Exchanger World Publisher
Heat Exchanger World is a leading international magazine covering all aspects of the product supply chain of heat exchangers. Heat Exchanger World is part of the KCI Group of Companies. We are a leading knowledge, communication and information company connecting business-to-business professionals by building and sustaining global communities, solving their information needs and helping them to develop their professional life and friendships.